Before any inspections will be made, the following must be in place:1. Access to a portable toilet for worker’s use.2. Crushed stone ramp to site to prevent mud from being traced onto streets.3. Straw bales, silt fences or other erosion control devices to keep soil & debris from leaving the site.Inspections required for all structures:1. Site Review & Erosion Control compliance (confirm setbacks; property corners to be located prior to inspection)2. Footing (before concrete is ordered or poured)3. Sill Plate and Anchor Bolts4. Slab5. Framing6. Plumbing rough-in7. Heating & air rough-in8. Final9. Certificate of Occupancy (before structure is occupied)