Cookeville Electric Department
Retail Rates
Effective May, 1 2012
|
Residential Rate: Schedule "RS" |
| Billing Rate | |||
|
Customer Charge |
10.00 | ||
|
First 800 KWH |
0.09091 | ||
|
All Additional |
0.08605 |
|
General Power Rate: Schedule "GSA" |
|
|
GSA-1 (0 - 50 KW & 0 - 15,000 KWH) Class 40 |
|
Customer Charge |
20.00 | ||
|
All KWH |
0.09940 |
|
GSA-2 (51 - 1,000 KWD or < 50 W\KWD & > 15,000 KWH) Class 50 |
|
Customer Charge |
50.00 | ||
|
First 15,000 KWH |
0.10002 | ||
|
Additional KWH |
0.05938 | ||
|
0-50 KW Demand |
No Charge | ||
|
51 - 1,000 KW Demand |
11.31 |
|
GSA-3 (1,001 - 5,000 KWD) Class 54 & 55 |
|
Customer Charge |
100.00 | ||
|
All KWH |
0.06301 | ||
|
0 - 1,000 KW Demand |
10.19 | ||
|
1,001 - 5,000 KW Demand |
10.17 |
|
SDE-General Power SGSB |
|
Customer Charge |
1,500.00 | ||
| Demand Charge | |||
|
Summer Period (Jun-Sep) |
21.03 | ||
|
Winter Period (Dec-Mar) |
15.31 | ||
| Transition Period (Oct, Nov, Apr, May) |
10.55 |
||
| Energy Charge | |||
| Summer Period (Jun-Sep) |
0.05220 |
||
| Winter Period (Dec-Mar) |
0.04151 |
||
|
Transition Period (Oct, Nov, Apr, May) |
0.04428 |
|
SDE-Manufacturing SMSB |
|
Customer Charge |
1,500.00 | ||
| Demand Charge | |||
|
Summer Period (Jun-Sep) |
18.22 | ||
|
Winter Period (Dec-Mar) |
12.41 | ||
| Transition Period (Oct, Nov, Apr, May) |
7.65 |
||
| Energy Charge | |||
| Summer Period (Jun-Sep) |
0.04477 |
||
| Winter Period (Dec-Mar) |
0.03331 |
||
|
Transition Period (Oct, Nov, Apr, May) |
0.03590 |
Outdoor Lighting Rate (Schedule LS)
|
Part A |
Charges for Street & Park Lighting, Traffic Signals, & Athletic Field Lighting |
|
1) Customer Charge |
2.50 |
|
|
2) Enregy Charge |
0.06365 |
|
Part B |
Charges for Outdoor Lighting for Individual Customers |
|
Type |
KWH | FAC Rental |
Energy |
Total |
|
100 WHPS |
42 | 5.13 | 2.67 | 7.80 |
|
250 LED |
20 | 12.03 | 1.27 | 13.30 |
|
250 WHPS |
105 | 7.10 | 6.68 | 13.78 |
|
250 WHPS-Flood |
105 | 11.09 | 6.68 | 17.77 |
|
400 WHPS |
165 | 7.10 | 10.50 | 17.60 |
|
400 WHPS-Flood |
165 | 11.09 | 10.50 | 21.59 |
|
175 WMV |
70 | 4.21 | 4.46 | 8.67 |
|
400 WMV |
155 | 5.49 | 9.87 | 15.36 |
|
250 WMHD |
105 | 7.74 | 6.68 |
14.42 |
| 350 WMHD-Flood |
140 |
8.14 |
8.91 |
17.05 |
| 350 WMHD-Shoe |
140 |
9.84 |
8.91 |
18.75 |
|
400 WMHD |
165 | 7.78 | 10.50 | 18.28 |
|
1000 WMHD |
398 | 9.42 | 25.33 |
34.75 |
30' - 35' WOOD POLE RENTAL CHARGE $3.00/month - Code 905
40' - 45' WOOD POLE RENTAL CHARGE $4.50/month - Code 906
50' WOOD POLE RENTAL CHARGE $5.50/month - Code 907
|
Customer may request C.E.D. to set a Special Pole (i.e. Fiberglass, Steel, Decorative). In this case, the Customer will be charged for the cost difference between a wood pole and the special pole requested, this is based on most current cost of specified pole. Special Poles Available:
|
|
Billing Demand = The Greater of: |
1) The Highest 30 Min. Interval KW During the Billing Period, OR |
|
Minimum Bill: |
Contract Demand (CD) X (20% X 51-1,000 KW Rate) + Customer Charge |
|
Minimum Bill: |
Contract Demand (CD) X (20% X 1,001-5,000 KW Rate) + Customer Charge |
|
Minimum Bill: |
Contract Demand (CD) X (30% X 5,000-15,000 KW Rate) + Customer Charge |